Dump Truck & Aggregate Rates
Cowichan Valley & Victoria BC
Our rates, in the open — no callback required to find out what a truck costs. Every hourly rate and material price we quote is on this page, tandem through quad, road base through jaw run.
Dump truck hourly rates
| Equipment | Max Capacity | Hourly Rate | |
|---|---|---|---|
| 01 | Tandem TruckSingle tandem dump truck — agile, tight-access capable. | 13–14 metric tonnes | $145/hr |
| 02 | Tandem Truck + Tandem PonyAdded pony trailer for mid-volume hauls. | 25–27 metric tonnes | $195/hr |
| 03 | Tandem Truck + Tridem PonyImproved load distribution for larger volumes. | 29–31 metric tonnes | $203/hr |
| 04 | Tandem Truck + Quad / TransferMaximum capacity for high-volume transport. | 40–45 metric tonnes | $240/hr |
Rates are portal-to-portal and include truck, fuel and operator. Capacity shown is the legal maximum for each configuration — actual payload depends on material density and road restrictions.
Aggregate & gravel prices per tonne
| Material | Unit | Price | |
|---|---|---|---|
| 01 | 3/4" Road BaseCompacting base for driveways, subgrade and road build-up. | per tonne | $17.60/tonne |
| 02 | 3/4" ClearWashed clear stone — drainage, perimeter tile, backfill. | per tonne | $21.45/tonne |
| 03 | HydroSpec (1/4")Fine spec bedding for utility and pipe installation. | per tonne | $24.75/tonne |
| 04 | BouldersLandscape and retaining boulders, sold by the load. | per load | $110/load |
| 05 | 2" MinusCoarse fill for bulk build-up and rough grade. | per load | $110/load |
| 06 | 5" Minus (Jaw Run)Heavy pit-run rock for structural fill and access mats. | per load | $209/load |
Material priced at the pit. Delivery is billed at the hourly truck rate above — call dispatch and we'll quote the combined number for your site.
Clean fill disposal & tipping
We take clean fill, pitrun, concrete and asphalt. Rates vary by material — call dispatch for a per-box number on your load.
Service area — Cowichan Valley & Greater Victoria
Yard at 841 Malahat Dr, Malahat — roughly 45 minutes to anywhere in the Cowichan Valley or Greater Victoria. Outside that band, call and we'll tell you honestly whether we're the right truck for the job.
Need a truck this week?
Dispatch runs 24/7. Tell us the material, the site and the window — we'll tell you the number before you commit.
