Aggregate & Gravel Delivery
Gravel, screened topsoil, drainage rock, and construction aggregates picked up at the pit and delivered direct to site. We run the trucks; the material is billed through at cost. Servicing residential driveways and commercial subgrades on Vancouver Island.
Estimate Before Ordering
Not sure how many yards or tons of gravel to order? Use our interactive calculators to compute volume requirements, adjust for standard compaction settlement, and compare dump truck configurations.
Aggregates & Soil Inventory
We source our materials from licensed island quarries and processing sites to ensure consistent grading, clean quality, and competitive local pricing.
3/4" Crushed Road Base
Ideal for driveways, parking lots, and subbases. Contains a blend of crushed rock and fines to pack down solid under compaction.
Clear Crush / Drain Rock
Clean crushed gravel without fines. Perfect for perimeter drains, retaining wall drainage backfills, and landscaping rock pits.
Screened Topsoil & Premium Mix
Finely screened rich loam soil. Ideal for lawn grading, sod prep, garden beds, and general landscape grading.
Bedding Sand & Fill Sand
Fine bedding sand for utility trenching, brick paver leveling, swimming pool bases, and general leveling sand.
Crusher Dust & Path Fines
Finely crushed rock dust. Best for paving stone bedding layers, stone walkways, and flagstone joint filling.
Round River Rock & Pea Gravel
Natural rounded river gravel in various sizes (pea gravel up to 3" stones) for decorative beds, garden accents, and dry creek beds.
Dump Truck Capacities & Logistics
Different aggregate volumes are best served by specific truck configuration classes. Under BC commercial regulations, axle weights restrict the maximum weight we can haul.
Tandem Dump Truck
Tandem Axle ClassBest for residential driveways, landscaping deliveries, tight access gates, and small job sites. High maneuverability makes it the island favorite for local builders.
Tridem Dump Truck
Tri-Axle ClassDesigned for commercial grading, heavy excavations, subdivisions, and larger civil works. Lower freight rate per ton makes this highly economical for volumes exceeding 10 yards.
Frequently Asked Questions
What the yards around you publish
Road base runs from $37.50 to $61.25 a cubic yard across four Island yards that publish a list, and one more sells the same product by the tonne. Read the unit before the number.
Ready to Order Gravel or Topsoil?
Call our dispatch desk for current material costs, load availability, and delivery schedules on Vancouver Island.
