Construction Waste Removal & Site Cleans
Fast, professional dump truck hauling for renovation debris, timber, concrete, and site waste. Fully compliant with Vancouver Island municipal recycling bylaws.
Strict Compliance Notice: NO Hazmat / Asbestos
Ronin Earthworks does **NOT** haul hazardous waste, toxic substances, or asbestos-containing materials (ACM). Any drywall or plaster material destined for disposal must be certified asbestos-free with a verified laboratory test report dated within the past 12 months. All other construction waste must be strictly sorted to comply with Regional District waste exclusion bylaws.
Materials We Haul
We provide clean-up and hauling for commercial contractors and residential renovators. Separating materials at the site level helps minimize landfill tipping surcharges.
Wood & Timber Waste
Recyclable clean lumber & wood
We haul structural framing, pallets, clean plywood, OSB, and dimensional timbers directly to local wood-recycling facilities.
Renovation & Demolition Rubble
Asphalt shingles, insulation, and metal
Bulk transport for roof shingle tear-offs, drywall (certified asbestos-free), insulation, piping, siding, and scrap metals.
Masonry & Concrete Debris
Concrete slabs, bricks, and paving rock
Heavy hauling for broken brick, stone masonry, excavation rocks, and crushed concrete rubble destined for aggregate crushing.
Vancouver Island Waste Disposal Facilities
We route all construction debris to authorized municipal landfills and private sorting transfer yards. Below are the primary regional hubs we utilize south of Duncan:
Hartland Landfill (Victoria / CRD)
Operated by the Capital Regional District, Hartland is the destination for non-recyclable demolition materials. Strict policies require source-separation of wood, metal, drywall, and cardboard to avoid 200% surcharge fines.
Ellice Recycling (Victoria / CRD)
A centrally located private commercial transfer station. Ellice accepts mixed construction loads and drywall (with lab tests) for processing, sorting out wood, metal, and cardboard for secondary processing.
Fisher Road Recycling (Cobble Hill / Mill Bay)
Located just south of Duncan, Fisher Road is a primary sorting facility. It accepts construction drywall, clean structural wood, roofing, and soils, helping Cowichan Valley contractors recycle efficiently.
Bings Creek Facility (Duncan / CVRD)
The Cowichan Valley Regional District’s solid waste hub. Accepts construction wood, metals, drywall, shingles, and cardboard. Helps ensure proper disposal logs for commercial permits.
Frequently Asked Questions
What each gate charges, and what it will turn away
A mixed demolition load has no single public home on the south Island: the CRD takes C&D and prohibits rubble, the CVRD does the exact reverse. These pages carry every published fee and every bylaw prohibition, by district.
Need Construction Waste Hauled?
We offer reliable tandem and tridem dump trucks for site clears, wood recycling, shingles, and structural debris removal south of Duncan.
