Victoria & Greater Victoria Area

Construction Waste Removal Victoria

Fast, local dump truck dispatch for commercial construction cleanups, timber waste, concrete slabs, and home renovation debris in Victoria, BC.

Drywall & Hazmat Notice for Victoria Jobs

We operate in strict alignment with CRD solid waste bylaws. Hazmat materials, including asbestos (ACM), radioactive components, lead, or bio-wastes, are **strictly excluded**. Drywall must have lab documentation proving it is asbestos-free before loading or dumping at local Victoria stations.

Victoria Disposal Channels

All non-hazardous waste is hauled directly to licensed local processing plants. We optimize tipping rates by sorting materials at source and utilizing:

  • Hartland Landfill: Used for mixed construction wood, shingles, and non-recyclable demolition solids.
  • Ellice Recycling: Private transfer station in Downtown Victoria. Ideal for rapid commercial bin drops and tested drywall.

Hauling & Clean-up Fleet

Our tandem and tridem dump trucks are equipped to clear demolition waste and load aggregates efficiently, helping construction sites stay organized.

  • Tandem dump truck site clearing capacity (GVWR 24,200kg)
  • Tridem dump truck heavy hauling capacity (GVWR 29,000kg)