Gravel Coverage & Compaction Calculator

Calculate exact aggregate quantities needed. Adjust for compaction volume loss (settlement) to ensure you order the correct tonnage.

Coverage Dimensions

Choose measurement mode and enter your target coverage details

30 ft
20 ft
4 inches
Standard road and driveway subbase. Compacts heavily (approx. 20%) to form a solid, interlocking surface.
+20%

Aggregates settle and compress when rolled. We automatically apply a compaction factor so your physical volume matches the depth requirements after rolling.

Material Requirements

0

Loose Cubic Yards

COMPACTED

0

Required Yards

Total Est. Weight

0 Tons

Uses density value of **1.45 tons/yd³** for this specific aggregate.

Recommended Logistics Dispatch

Tandem Load (Capacity 12.5T)1 Load
Tridem Load (Capacity 17.0T)1 Load