Campbell River, BC

Site Servicing & Underground Utilities in Campbell River

Site preparation and utility trenching for Campbell River developments. Storm, sewer and water runs dug to grade, bedded, backfilled and hauled off for your residential or commercial project.

North Island Site Servicing Experts

Utility trenching and site preparation for Campbell River and surrounding communities

Our Capabilities

  • Utility trenching and excavation
  • Storm drainage systems
  • Municipal sewer trench excavation
  • Septic system installation

Areas Served

  • Campbell River
  • Courtenay and Comox
  • Cumberland and Royston
  • All North Island communities

Site Servicing Excavation in Campbell River

Storm Drainage Systems

Storm drainage excavation for Campbell River properties. We dig the runs, basins and swales that carry North Island rainfall away from your buildings, cut to the grades your drawings specify and to municipal requirements.

  • Storm drain excavation
  • Catch basin excavation
  • French drain systems
  • Drainage swales

Sewer Trenching & Septic Excavation

Sewer line trenching and septic system excavation for Campbell River developments. We hold the grades your drawings call for and dig to health and municipal regulations.

  • Sanitary sewer trenching
  • Septic tank installation
  • Septic field excavation
  • Pump station excavation

Water Line Trenching

Water service trenching for new construction and upgrades in Campbell River. From the main to the building, we open the run at the right depth and hold it there.

  • Water main trench excavation
  • Service line trenching
  • Hydrant tie-in excavation
  • Meter box excavation
20+

Years Experience

100%

Code Compliant

Full

Insurance Coverage

Need Site Servicing in Campbell River?

Contact us today for utility trenching and site preparation throughout Campbell River and North Vancouver Island.